Towers, for the whole of which materials no
made
charge
will be
Quantity
Cube: yards
cube feet
Timber will also be provided if required the Contractor paying for the same at cost price.
609 Excavation for foundations
12333 Rough granite in
661 15 Brickwork laid in mortar including price
of Scaffolding -
Estimati
Rate merent
d.
6
15
4
سوگو
308
6
719207
16
123 10
course 1. & high_
a
4410
steps to entrance.__
اخر
26
7
48
9
27
forring
2 50
68
**
0 200
2964 Brickwork laid in Cement in pillars
lin: It
712 Pressed granite Plinthi
sup feet
904
80 Carved stone corbels,
sups: feet
100 Dressed
Dressed granite steps in circular stairs
& granite steps
squares
27 28
54.25 Marble flooring
251.8 Plastering interior including all mouldings
223
110.
cube feet
237.
exterior in Roman Cement Z
"Manila hardwood wrought and fixed
283.84
239.25
ل جوان
4
442 10
44
223 30 1657
8 9
00 20
روح کرد
سرم
Double tiling laid in mortar
04.
trot beaded framed & fixed_ __Circular, moulded, fod & fixed
@16.
s. d
4.6
77 15 167184
75 403
746. 3 American pitch pine wrot, beaded & fixed
• __ the planking, worst, tongued, and grooved, beaded and fixed:
squa124-
107.5
30. 26
grooved and fixed.
suhe fest 206 lin St.
112
China fir is planking wrote, longued,
Thina for joisting, wrought & fixed
Manila hardebood step ladder
14 3 Manila hardwood doors framed, moulded,
Gothic arched and hung complete, frames
included
hung
Carried forward
20
"
57.666 2
20 12
11 4
6
260 52
"
$4465 10 14